This week we were able to straighten the rain shelter on 6 at Live Oak. We crossed cables on both sides to stabilize the cover. We did lower the 2x4 to waist height mainly to block off the area the wires are located. This was more of a safety issue than a structural fix. I think it turned out great and the structure is not leaning anymore. Here is a picture of the finished project....
No comments:
Post a Comment